Menu

Tag: energy-from-waste facility

Part 1: A waste newbie’s week of site visits – key takeaways

16th December 2022 Posted by

Our Social Value and Sustainability Intern, Emily Nurse shares her key learnings from her week of visiting various SUEZ locations across the UK. During October, I was given the opportunity to visit a number of SUEZ recycling and recovery UK waste management sites around the country. Having only been at SUEZ since September, it was a fantastic chance for me

Energy from Waste technology is at the heart of a shift to a circular economy

13th June 2018 Posted by

Posted by Dr Adam Read. I was fortunate enough to attend the launch of the Environmental Services Association (ESA) report on the role of energy recovery in a circular economy last week (6 June) at the House of Commons, which was both well attended and well received. It is a short document (thankfully I hear you cry) that highlights the

SUEZ site-seeing | Part 12 | Suffolk energy-from-waste (EfW) facility

23rd April 2018 Posted by

Posted by Dr Adam Read. The energy-from-waste facility, located in Great Blakenham, Suffolk is one of our newest sites which began operating in December 2014. The facility manages residual waste from Suffolk households in partnership with Suffolk County Council, though a 25-year partnership agreement. The site can process 269,000 tonnes of waste per annum, with 175,000 tonnes coming directly from Suffolk

SUEZ site-seeing | Part 11 | Tees Valley energy-from-waste (EfW) facilities

11th April 2018 Posted by

Posted by Dr Adam Read. Middlesbrough is home to three SUEZ sites with a total capacity in excess of 550,000 tonnes per annum. The sites all operate independently, due to contractual requirements, but share experiences and developed local resilience in order to cover downtime and spare parts etc. The whole site operates 24 hours a day, seven days a week,

SUEZ site-seeing | Part 10 | Kirklees materials recycling facility (MRF) and energy-from-waste (EfW) facility

4th April 2018 Posted by

Posted by Dr Adam Read. SUEZ’s Kirklees site, located near Leeds, is one of the older sites and contracts in the SUEZ portfolio, which is an integrated contract dating back to 1998. The council collects recycling and residual waste commingled and brings both streams to the site for processing. Over 90 per cent of the waste is diverted from landfill

SUEZ site-seeing | Part 9 | Knowsley rail transfer station (Merseyside)

26th March 2018 Posted by

Posted by Dr Adam Read. Merseyside Energy Recovery Limited (MERL) is a consortium of companies brought together with the purpose of helping  Merseyside Recycling and Waste Authority (MRWA) manage household waste in the most sustainable way. The MERL consortium consists of three companies, SUEZ recycling and recovery UK, Sembcorp Utilities UK, and I-Environment Investments Ltd. Together, the consortium has financed,

Email Share Social Share
LinkedIn
Facebook
Back to Top